Dataset: Tasmanian Natural Gas Pipeline Survey Aug-Sept 2000


Description

In the planing of the construction of a gas pipeline from Longford in Victoria to Bell Bay in Tasmania by Duke Energy International various environmental approvals were required from the Tasmanian, Victorian and Commonwealth Governments in Australia. CSIRO Marine Research conducted a photographic inspection and took dredge samples of the seafloor at points along the proposed pipeline route to provide input to these environmental assessments.The marine section of the route runs from Seaspray (Vic) through to Five Mile Bluff (Tas). The survey method and results are provided in the form of a 'data report' . see link below.

General Information

Distributions